Wind Energy

Industry Tradeshow

WindEnergy Hamburg 2024

Booth B6.480
September 24-27, 2024, HMC Fairground, Hamburg, Germany

Thanks for coming by!

It was a pleasure meeting you at WindEnergy 2024! We enjoyed discussing how our smart cable accessories and grid monitoring solutions can enhance the performance and reliability of your onshore and offshore wind farms. Together, we accelerate the transition towards more sustainable and resilient energy grids worldwide.

WindEnergy 2024
Thank you!
WindEnergy 2024
Thank you!

Smart Solutions for Your Wind Projects

Every connection counts when downtime can cost you millions. Your success depends on high-performing and long-lasting connections. Connections that last as long as your wind farm’s lifetime and can withstand the harshest environments with minimal maintenance.

Stay up and Running

A failure of cable accessories in a 2 MW turbine can lead up to $30,000 in repair costs and up to $100,000 in lost revenue. Our connectivity products are high quality and field-proven. They are engineered and tested specifically for the wind farm environment so they are durable to tackle the toughest humidity, temperatures, and corrosion.

How Can We Help?

From turbine to smart grid, substation and energy storage – TE Connectivity is your one-stop-shop for all connectivity needs. With over 65 years of experience in the energy industry, we are dedicated to overcoming even the toughest connectivity challenges in your wind projects and beyond.

Contact Us to Learn More