Bus Bar and Cable Assemblies for OCP (English)

To help eliminate power loss and minimize unwanted system downtime, TE’s bus bar clip and power cable assemblies for OCP utilize a reliable ferrule crimp connection and a hot-pluggable design. And with an allowable misalignment of plus or minus .75mm, the connector assembly permits quick and easy connections to the bus bar. This system is fully compatible with both Open Rack V1 and V2 specifications.

Spokesperson: (V.O.) To meet the Open Compute Project (OCP) distribution architecture, and provide a simple yet customizable design that enables efficient and reliable power distribution

 

Spokesperson: TE Connectivity developed a power bus bar clip and cable assembly solution feature its proven CROWN CLIP Junior and MULTI-BEAM XLE connectors.

 

Bus Bar Clip & Power Cable Assemblies for Open Compute Project

Featuring CROWN CLIP Jr. and MULTI-BEAM XLE Power Connectors

 

Spokesperson: (V.O.) Designed to distribute 120 amps of power per UL and CSA criteria, while delivering low resistance, and low milli-volt drop, TE’s bus bar clip and power cable assemblies for OCP is a standardized platform that offers an efficient power distribution solution with low energy consumption and greater operational cost savings.

 

Bus Bar Clip & Power Cable Assemblies for Open Compute Project

Featuring CROWN CLIP Jr. and MULTI-BEAM XLE Power Connectors


Reliable ferrule crimp connection
Allows misalignment of +/- 0.75mm
Compatible with Open Rack V1 and V2 specification


Spokesperson: (V.O.) To help eliminate power loss and minimize unwanted system downtime, TE’s bus bar clip and power cable assemblies for OCP utilize a reliable ferrule crimp connection and a hot-pluggable design. And with an allowable misalignment of plus or minus .75mm, the connector assembly permits quick and easy connections to the bus bar. This system is fully compatible with both Open Rack V1 and V2 specifications.

 

Spokesperson: Another key feature of this connector and cable assembly solution is its ability to reduce the number of bus bars in a rack from three to one, greatly saving costs and streamlining the power distribution architecture.

 

Bus Bar Clip & Power Cable Assemblies for Open Compute Project

Featuring CROWN CLIP Jr. and MULTI-BEAM XLE Power Connectors


Quick & Simple Installation
Efficient Power Distribution
Standard Connectivity Platform

 

Spokesperson: (V.O.) TE’s Bus Bar Clip and Power Cable Assemblies, offer a more efficient power distribution solution and operational cost savings for Open Compute Project architecture

 

Quick & Simple Installation
Efficient Power Distribution

Standard Connectivity Platform

 

Bus Bar Clip and Power Cable Assemblies for Open Compute Project from TE Connectivity.

 

Contact your TE representative or distributor today.

 

Spokesperson: Want to learn more? Contact your TE representative or distributor today!

 

CROWN CLIP, MULTI-BEAM XLE, TE Connectivity, TE, TE connectivity (logo) and EVERY CONNECTION COUNTS are trademarks.