Case Study
On-Site Adjustments During Solar Farm Construction
Delivering 75 MW solar farm with zero change orders & zero liquidated damages.
One of the top 10 EPCs in the United States selected TE Connectivity to provide the Electrical Balance of System (EBoS) for a 75 MW utility-scale solar farm in New Mexico. During construction, engineers encountered an unexpected challenge which could only be resolved thanks to the flexibility and adaptability of TE’s Customizable Trunk Solution CTS.
Project outcome
0
change orders or liquidated damages
12 MW
area reconfigured on-site
We’re looking at ways to accelerate operational efficiency, and the CTS works perfectly.
- Pat Gangemi,
- Construction Manager, Greenwood Solutions, Solar EPC
This is the first time I have ever used TE products and after working on other farms, it's clear this system is quicker and easier to wire. The whole system goes together really well.
- Paul Caufield,
- Managing Director, Elecforce Australia, Solar Electrical Installers