Reliability and Cost Savings for Solar Farms
Delivering $12.8M cost savings with less trenching, fewer access roads and efficient cabling design.
TE Connectivity won a major contract with a top-tier Engineering, Procurement, and Construction Company EPC to build a 640+MW utility-scale solar farm. TE’s Customizable Trunk Solution CTS provided a comprehensive, reliable, and high-performing Electrical Balance of System EBoS which catered to the unique requirements of this solar farm implementation and delivered significant cost savings.
Project outcome
$12M+
labor and materials savings
67%
installation time savings