Case Study
Reliability and Cost Savings for Solar Farms
Delivering $12.8M cost savings with less trenching, fewer access roads and efficient cabling design.
TE Connectivity won a major contract with a top-tier Engineering, Procurement, and Construction Company EPC to build a 640+MW utility-scale solar farm. TE’s Customizable Trunk Solution CTS provided a comprehensive, reliable, and high-performing Electrical Balance of System EBoS which catered to the unique requirements of this solar farm implementation and delivered significant cost savings.
Project outcome
$12M+
labor and materials savings
67%
installation time savings
We’re looking at ways to accelerate operational efficiency, and the CTS works perfectly.
- Pat Gangemi,
- Construction Manager, Greenwood Solutions, Solar EPC
This is the first time I have ever used TE products and after working on other farms, it's clear this system is quicker and easier to wire. The whole system goes together really well.
- Paul Caufield,
- Managing Director, Elecforce Australia, Solar Electrical Installers