CTS case study - Cost reduction

Case Study

Reliability and Cost Savings for Solar Farms

Delivering $12.8M cost savings with less trenching, fewer access roads and efficient cabling design.

TE Connectivity won a major contract with a top-tier Engineering, Procurement, and Construction Company EPC to build a 640+MW utility-scale solar farm.  TE’s Customizable Trunk Solution CTS provided a comprehensive, reliable, and high-performing Electrical Balance of System EBoS which catered to the unique requirements of this solar farm implementation and delivered significant cost savings.

$12M+

labor and materials savings

67%

installation time savings

We’re looking at ways to accelerate operational efficiency, and the CTS works perfectly.
Pat Gangemi,
Construction Manager, Greenwood Solutions, Solar EPC
This is the first time I have ever used TE products and after working on other farms, it's clear this system is quicker and easier to wire. The whole system goes together really well.
Paul Caufield,
Managing Director, Elecforce Australia, Solar Electrical Installers