HVCA training

2-Year Installer Certification for Raychem High Voltage Cable Accessories (HVCA)

Register Here
*Required fields

Your Information

View the General Conditions of Participation document found on this page.

BECOME A CERTIFIED INSTALLER

Gain the technical knowledge and practical skills to successfully and safely install selected Raychem HVCA products from TE Connectivity (TE), ranging from 69 kV to 230 kV. Our installer certification is valid for two years depending upon your course selection. Courses cover dry terminations, compact pluggable switchgear terminations, inline and shield break splices.

 

The Training Includes:

• Overview of our product design specifications

• Review of our product installation instructions

• Installation techniques and methods

• Cable preparation assessment

• Identification of installation errors

OUR TRAINING CONTENT

In English
Maximum 4 participants per course

DATE   OVERVIEW

Day 1 

• Product overview presentation

• Raychem HVCA product and tools introduction

• Preparation for installation

• Tools and cable preparation

• Familiarization with different metallica shields 

Day 2 

• Installation of our Raychem EHVS HV splices  

Day 3 

• Installation of our Raychem OHVT HV termination

Day 4 

• Installation of our Raychem PHVX HV switchgear termination

Day 5 

• Final installation and examination 

• Assessment and feedback with Question & Answer session

YOUR BENEFITS

• Increased grid reliability thanks to our experts' installer practices and trainer knowledge

• Installation consulting support during your 2-year certificate

• Stay up to date with the latest product updates and innovations 

TRAINING PREREQUISITES

• You are an installer or splicer of HV cable accessories

• You have 1+ years of HVCA product installation experience, including HV cable preparation, system extension, connection, refurbishment, maintenance and repairs

• You are required to provide TE with a cable preparation certificate before registration

TOOLS REQUIRED

Participants must bring:

• Appropriate PPE equipment including fire resistant clothing, safety shoes or boots, and gloves

• Appropriate hand tools

 

High voltage installation tools are provided but trainees also can bring their own tools for the training class.

HV CABLE AND ACCESSORIES

Standard cable and accessories will be used:

• 500 kcmil to 2000 kcmil cable Al/Cu with Cu wire and Al foil

 

If you need a different or customized cable type to be used in the training session, please contact our training experts to arrange.

DURATION

• 4 to 5 days depending on the selected products

LOCATION AND HOTELS

For directions to our Training Center in Fuquay-Varina, USA, click HERE.

 

We can recommend some hotels near our training center: HOTEL LIST