
CASE STUDY
Streamlined Trunk Bus Architecture Speeds Solar Farm Installation
TE Connectivity´s Customizable Trunk Solution helps a large Midwestern solar farm to simplify and accelerate electrical connection installations – a welcome improvement against the backdrop of particularly challenging site conditions.
Project outcome
1.5%
reduced voltage losses
40%
saving in cable and installation costs