CTS Case Study

CASE STUDY

Streamlined Trunk Bus Architecture Speeds Solar Farm Installation

TE Connectivity´s Customizable Trunk Solution helps a large Midwestern solar farm to simplify and accelerate electrical connection installations – a welcome improvement against the backdrop of particularly challenging site conditions.

1.5%

reduced voltage losses

40%

saving in cable and installation costs